MANSFIELDS MAINTENANCE REGISTER

Checks • PPM • Daily • Weekly • Toolbox • Handover

Data source: Mitti / SafetyCulture Exporter
Daily, Weekly and PPM use the same Line / Equipment list. Select a check type, area and line/equipment, then click a day to view matching checks.
Engineer name uses the actual “Conducted by / Completed by / PPM Completed by” field from each inspection when available. The account author is used only as fallback.
PPM date logic: Each planned PPM represents the night shift starting on that date. The normal completion window is 06:00 on the planned date through 06:00 the following morning (for example, 23 Sep → 24 Sep 06:00). The PPM stays displayed on its planned date while the actual Mitti completion date remains visible in the details. A strict same-equipment fallback is used only for late/recreated PPM records.

TOTAL CHECKS COMPLETED

Checks completed0
100% score0
Attention required0
Rectified0
Not in use0
Not in use today0
PPM completed0
PPM overdue0

Configured Mitti Sources

Daily East Daily West Daily Dispatch Weekly East Weekly West Weekly Dispatch PPM East PPM West Toolbox East Toolbox West Handover (future)
Daily shows only line/equipment Daily Checks. Toolbox shows only East/West Daily Toolbox Checks. East PPM records are also loaded. Other Daily, Weekly and West PPM records will populate once their Mitti export records are added.

Admin – Deleted Mitti Records

Internal technical log only. These records are excluded from the normal register, calendar, statistics, Workshop status and PPM completion matching.
TypeArea / EquipmentOriginal completion EngineerScoreDeleted detectedAudit ID

Maintenance Compliance Register • Read-only public view • Source: Mitti / SafetyCulture exports